Site Mailing List
Register with this site to receive email notifications, updates and new site information. Enter your email address and press the submit button.

Email Address:
*
Verify image below:
*

 Validation Definitions 
Roles & Responsibility

Authorizing Engineer Text to follow...

Test Terminology

Indicated Values are shown by a permanently installed dial or other visual indicator fitted to the ultrasonic cleaner, washer disinfector or sterilizer.

Recorded Values are shown by a permanently installed recording device fitted to the ultrasonic cleaner, washer disinfector or sterilizer.

Measured Values are provided through test instrumentation such as test recorders and pressure gauges that are temporarily installed to the ultrasonic cleaner, washer disinfector or sterilizer during testing.

Holding Time is the period of a disinfection or sterilization cycle where all measured temperatures within the load and chamber are within the appropriate bands during the thermometric test.

Equilibration Time is the difference in time between the chamber and the load reaching the appropriate disinfection or sterilization band during the thermometric test.

Plateau Period is the time between start of equilibration and the end of the holding time.
Eschmann Spare Parts 
ISL is an ISO 9001:2000 Registered Company

Isopharm Sentry Limited | The Validation Centre | Thornbury Hill Lane | Near Firbeck | Rotherham | S81 8JW | United Kingdom
Tel +44 (0) 1709 811460 | Fax +44 (0) 01709 811461 (Sales)
| Fax +44 (0) 01709 811462 (Accounts)

sales@isopharm-sentry.com | www.isopharm-sentry.com

VAT Number: GB737 943 78 | Registered in England and Wales 3843619 | ISO9001:2000 Registered Company LRQA 4001093

Office Hours Mon-Fri 9am to 5pm (GMT)

Online shop open 24 Hours a day 365 days per year

Site Powered By
    WebKeeper WebSite Builder
    Online web site design